Giao din vi cc nh thu:Phi hp giao din gia cc gi EPC & BoP
Contractors interface:Interface coordination between EPC & BoP packages
Qun l k thut:
Engineering management:
Ph trch v n c Nh thu thit k, thi cng ng yu cu k thut v h s thit k c duyt m bo cht lng v tin .
In charge and urge the contractor to design and construct following technical requirements and approved design documents to ensure quality and progress.
Ph trch cng tc nghim thu thi cng, lp t thit b ng yu cu k thut v cc h s c ph duyt.
Responsible for acceptance of construction and equipment installation following technical requirements and approved documents.
nh gi ti liu v tua-bin gi v xc nh cc sai lch so vi cc thng s k thut mua hng v cc thng s quan trng v cht lng
Review wind turbine documentation and identify deviations from purchasing specifications and critical quality parameters
Phi hp m phn vn k thut ni b v bn ngoi Cng ty
Coordinate negotiations on technical issues internally and externally
Thit k k thut:Ph trch lin quan n cc cng tc thit k ca D n.
Technical design:In charge of the project's design work
Qun l in:
Electrical management:
Ph trch cng tc r sot v kim tra ni dung h s cht lng (phn in) ca ton b Nh my do Nh thu thc hin ng k thut v h s thit k c ph duyt.
In charge of reviewing and checking the content of quality documents (electrical section) of the entire plant implemented by the Contractor according to the technical specifications and approved design documents
Qun l ton b phm vi in ca cc nh my nng lng bao gm h thng iu khin tuabin gi, cp, nng cp trm bin p in, ng dy ti in, kt ni vi trm bin p khc.
Manage the entire electrical scope of energy plants including wind turbine control systems, cables, electrical substation upgrades, transmission lines, and connections to other substations
An ton:H tr cho cng vic ca qun l HSEQ
Safety:support for HSEQ management
Giy php:
Permit:
Ph trch cng tc h s v cc bn lin quan ra Giy php hot ng in lc.
In charge of documents and relevant parties to issue the Electricity Operation License
Phi hp vi cc phng ban chun b h s m phn gi in, PPA ca D n.
Coordinate with departments to prepare electricity price negotiation documents and Project PPA
Lm giy php vi cc S (S KH & T, S NN & PTNT, S TNMT, SCT, Thu, v.v.)
Work with Provincial departments (DPI, DARD, DONRE, DOIT, Tax, etc.)for permit issues
Hon thnh d n
Project completion
Ph trch cng tc chun b h s lin quan cng tc nghim thu ng in, nghim thu hon thnh cng trnh v COD.
In charge of preparing documents related to energizing acceptance, project completion acceptance, and COD.
Theo di v n c nh thu thc hin cc cng vic lin quan n cng tc nghim thu ng in v COD.
Monitor and urge contractors to carry out work related to energizing acceptance and COD work.
Tham mu, xut vi cp trn m bo D n hon thnh cng tc nghim thu ng in v COD.
Advise and propose to superiors to ensure the Project completes energization and COD acceptance work.
Phi hp vi EVNSPC, A0/A2 v cc c quan trc thuc EVN thc hin cc cng tc nghim thu ng in, ha li, v cc cng tc khc lin quan.
Coordinate with EVNSPC, A0/A2, and subordinate units of EVN to carry out energizing acceptance, grid connection, and other related works.
Vn hnh d n
Project operation
Qun l vn hnh v bo tr (O & M) ti cc nh my
Operations and maintenance (O&M) at plants
Tham gia qun l trc tip cng tc vn hnh khi nh my i vo hot ng v vn hnh thng mi, cng tc bo tr phng nga.
Participate in direct management of operations when the factory comes into operation and commercial operation, and preventive maintenance.
Theo di v qun l hp ng cc gi thu phc v cng tc vn hnh nh my.
Monitor and manage contracts for bidding packages for plant operations purposes.
Ph trch cng tc qun lkim tra, bo dng nh k my mc, thit b nh my.
In charge of management, inspection, and periodic maintenance of the plant machinery and equipment.
Ph trch lin quan n cng tc vn hnh cng nh cc yu cu v ch bo co vn hnh, ng k cng sut i vi iu A2, A0, EVNSPC. m bo thc hin tt quy trnh phi hp vn hnh gia nh my v iu A2, A0, EVNSPC.
Responsible for operations as well as operational reporting requirements and capacity registration with Dispatchers A2, A0, and EVNSPC. Ensure good implementation of the operational coordination process between the plant and Dispatchers A2, A0, and EVNSPC.
Gim st cc nh thu cung cp, lp t v vn hnh h thng SCADA ti nh my
Supervise contractors providing, installing and operating SCADA systems at the plant
iu phi h thng PLC & SCADA ca nh my
Coordinate the plant's PLC & SCADA system
Qun l hp ng:Qun l hp ng k thut & thi cng v lin lc vi cc nh cung cp
Contract management:Manage engineering & construction contracts and liaise with suppliers
Bo co ni b:H tr qun l cp cao v cc thnh vin khc trong nhm cho bt k yu cu bo co t xut no.
Internal Reporting:Support senior management and other team members for any ad-hoc reporting requirements
REQUIREMENTS:
Bachelor's degree or higher in engineering, business, or construction management (Project Management Certificate or relevant work certificates are the plus).
5-10 years of experience working on-site (preferably on Wind projects).
Good command of English, previous work experience with foreigners or overseas education is preferred.
Have a good set of skills in analytical, communication, contracting, financial, interpersonal, and management.